无码精品一区二区三区四区爱奇艺_69堂亚洲国产日韩精品无码专区成人妻中文字幕一区二区三区在线久久久久_欧美MV日韩MV国产网站

Welcome to [ Wuxi Funecon Precision Mould Plastic Co., Ltd. ] website! Home| Sitemap| Email
Moulding Your Future

Enquiry:

138-6185-1071

138-6185-1071

What are the main aspects of injection mold cooling water leakage

Injection mold cooling water leakage is a frequent occurrence, for many reasons, mainly in the following aspects:
The most occurs at the joint of the mold cooling water pipe. If water leakage is found, the sealing tape should be wound around the thread of the pipe joint and then tightened.
2, Due to long-term molding conditions, the waterproof ring inside the mold will be damaged, and the O-shaped waterproof rubber ring will easily harden and crack, resulting in water leakage. Some poorly installed waterproof rings can also cause seal failure. It is generally necessary to regularly check the installation position and sealing performance of the seal.
3, The hole wall of the cooling water hole is broken. This often happens when a new mold is tried. The wall thickness of the design is sufficient, but the hole wall is broken due to machining errors or post-processing. In most cases, leaking water holes can no longer be used.
4, Regularly repair the heating pipe and decompression pump and use. The heating tube is an effective heat transfer element and is very effective for core cooling of deep and deep structures. In the area where the cooling water is easy to pass, a one-way heating pipe is provided to reduce water leakage. In addition, the use of a vacuum pump to pump cooling water is also a method to prevent leakage of cooling water.
5, maintenance of the cooling water hole. It is easy to form scale in the cooling water hole, which hinders heat transfer. In severe cases, the water path is blocked and needs regular maintenance. For straight water holes, an iron bar that is 0.5 mm smaller than the diameter of the cooling water hole can be inserted and tapped with a hammer to remove scale and rust. For the cooling water pipe buried in the mold, the mold should be disassembled to remove rust.
After the inspection, the water leakage test should be carried out. The hand pressure pump is used to fill the water hole with water, and it is kept at a pressure of 2 MPa for 5 minutes. It is judged whether the water hole leaks by observing whether the water pressure is lowered. The water leakage can be blocked by mechanical fastening using elastic materials such as rubber and cork, and the room temperature curing type silica gel can be tried as a sealing material.
2018/08/02 10:11:16 6611 次

Hot News

Copy right of the 2018 Wuxi Funecon Precision Mould Plastic Co., Ltd. All Rights Reserved

沈阳中德园发布新工业场景 以零碳园区架起国际绿色合作桥梁 12月22日A股成交额前十大个股,中际旭创(300308)居首 中汽协:1-11月销量排名前十轿车生产企业共销售782.6万辆 谁在分羹“最赚钱新股”盛宴?IPO热潮下券商的造富“生意经”|华泰汽车 华盛昌:实施稳健分红政策回报股东|华盛昌 普惠金融丨宁波银行南京分行:以普惠金融为笔,绘就小微企业成长新图景|普惠金融 众安信科CEO郁锋荣登2025IDC中国生态名人堂,彰显AI生态拓疆者远见 中信证券:推动人民币升值的因素逐渐增多 一次性信用修复政策来了!涉及信用卡、房贷、消费贷,还款后“免申即享”|征信 特朗普给联邦政府加假两天 但美国国债按原计划标售 三里屯商圈焕新 北京时尚消费趋于体验驱动|北京市 降息,大消息!美联储,重磅传来!|美联储 博威合金:公司的直接客户是以泰科电子为代表的国际公司,其是否供给美国spacex公司穿透难度比较大|美国 沈逸:大国博弈促使钢铁供应链从全球化向区域化、阵营化演变 地方主官会见民营企业家 传递发展强信号 探亲时遇村庄火灾 战士冲进火场救人 江苏博云最新筹码趋于集中|江苏省 平安寿险核保以智能与人工双轨,保客户权益无忧 11月新能源VAN: 销3.03万辆趋稳,大面领涨!远程连冠/江铃暴涨|新能源 浦东机场货运站获得国际航空运输协会(IATA)航空货物运输全品类认证 永赢基金频频出圈,热点红利能否转化为长期实力?